Along with stone, clay and animal parts, wood was one of the first materials worked by early humans. Microwear analysis of the Mousterian stone tools used by the Neanderthals show that many were used to work wood. The development of civilization was closely tied to the development of increasingly greater degrees of skill in working these materials.

Basically, I created a linear outfeed area, which includes the miter-saw station with folding wings, tablesaw with folding outfeed table, and my large router table, all in a line along the 20-ft. wall and set at the same height. The miter-saw station converts easily for use with a mortiser—with workpiece support on both sides—and it also accepts a minilathe. I even planned a location for all of the tools, blades, and jigs used with the tablesaw: on the operator side, for easy access.


Great info I’m in shop build right now finally after going through the tool purchasing period as I was tired of not having the correct tool for the job I wanted to start. Should be up and organized in a month or so In between baby duties. Wondered if you’d be interested in seeing the finished product and maybe offer some thoughts on how it’s setup it’s always good to have another pair of eyes to spot any problems.


You sure make “keeping up with the Spagnuolo’s” tough. :) The cart fits my space pretty well. I am somewhat limited so utilizing the space under the lumber rack works well for me. I have the stand alone scrap storage bin also but the extra scrap storage on the cart is a bonus. I always seem to have srcap lumber running out of my ears. I have a hard time throwing away even a small piece of walnut or other nice (expensive) wood.
Usually ducting is well covered and one of the first things considered, however, most people initially neglect clean up when designing shops. With growth, I have a very cluttered shop that makes pulling shop vacs around frustrating especially if you’re at the wrong end of a 5m flexible hose without having to struggle with the vac (the practice of in no doubt exacerbated by those ridiculous vacuuming ads on TV). As my setup is retro fitted, it may not be pretty as it is ducted overhead, but it is productive. I have a centralised heavy duty ‘shop vac’ (rigged with a Dust Deputy) and 50mm stormwater piping radiating to selective parts (corners) of the workshop. I use 50mm water diverters to act as blast-gates to control the flow of air (I have a bank of them running down one full side of the workshop spaced about 5m apart). When I need to clean a part of the shop I plug the vac into the appropriate overhead vent, organise the diverters and attach a 5m flexible hose to the working end. I have the vac on a remote (one of those that control power points – all my dust extraction is controlled by these – after modifying any proprietary mag switches) and I can vacuum any part of my workshop without having to go and manually switch the vac on. I have bought some cheap off market flexible hoses and spread them at the extremities of the workshop. Each outlet will accept the hose. Hint – I bought a fairly low end 3D printer ($800 (Aust)) and I can print any sized coupling to accommodate all those non-standard ‘shop vac’ hoses/fittings to accept my proprietary shop vac accessories. Duct tape is now reserved for the few threaded non-standard couplings.
Unless you’re a big fan of frequent shop remodeling, planning the layout of your workshop early in its development will save you a lot of time and trouble and also can keep you from spending years in an uncomfortable, poorly organized space. And if you already work in a shop that’s as organized as a trailer park after a tornado, careful planning and a little remodeling is likely to help you make a quantum leap.
×